1998 - USA - Analysis of Corridor Delay Under SCATS Control: Final Report On analysis Of Corridor Delay Under SCATS Adaptive Control System (Orchard Lake Road Corridor)
1998 - USA - Analysis of Corridor Delay Under SCATS Control: Final Report On analysis Of Corridor Delay Under SCATS Adaptive Control System (Orchard Lake Road Corridor)
Description
This study was designed to determine the change in travel time following the implementation of the Sydney Coordinated Adaptive Traffic System (SCATS) in Oakland County, Michigan. A before/after comparison was used to examine the change in travel time on a specific corridor (Orchard Lake Road).This study was designed to determine the change in travel time following the implementation of the Sydney Coordinated Adaptive Traffic System (SCATS) in Oakland County, Michigan. A before/after comparison was used to examine the change in travel time on a specific corridor (Orchard Lake Road).