• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png
  • 16.png
  • 17.png
  • 18.png

2004 - USA - NCHRP Report 523: Optimal Timing of Pavement Preventive Maintenance Treatment Applications

2004 - USA - NCHRP Report 523: Optimal Timing of Pavement Preventive Maintenance Treatment Applications

2004 - USA - NCHRP Report 523: Optimal Timing of Pavement Preventive Maintenance Treatment Applications

Description

This report describes a methodology for determining the optimal timing for the application of preventive maintenance treatments to flexible and rigid pavements. The methodology is also presented in the form of a macro-driven Microsoft® Excel Visual Basic Application—designated OPTime—available to users by accessing the NCHRP website (http://trb.org/news/blurb_detail.asp?id=4306). The methodology is based on the analysis of performance and cost data and applies to any of the treatments and application methods that are used by highway agencies.This report describes a methodology for determining the optimal timing for the application of preventive maintenance treatments to flexible and rigid pavements. The methodology is also presented in the form of a macro-driven Microsoft® Excel Visual Basic Application—designated OPTime—available to users by accessing the NCHRP website (http://trb.org/news/blurb_detail.asp?id=4306). The methodology is based on the analysis of performance and cost data and applies to any of the treatments and application methods that are used by highway agencies.

Published on
25 June 2019
Last Updated Date
21-03-2018
File Size
967.41 KB
File Type
application/pdf
Hits
1224 Hits
Download
1187 times
×