2009 - USA - Synthesis on Performance Based Maintenance Contracting
2009 - USA - Synthesis on Performance Based Maintenance Contracting
Description
TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 389: Performance-Based Contracting for Maintenance explores experience with performance-based maintenance contracting in places where it has been adopted, including such issues as whether it has the potential to reduce costs and improve maintenance levels of service.
TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 389: Performance-Based Contracting for Maintenance explores experience with performance-based maintenance contracting in places where it has been adopted, including such issues as whether it has the potential to reduce costs and improve maintenance levels of service.