• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png
  • 16.png
  • 17.png
  • 18.png

2007 - WB - Design and Procurement of Long Term Pilot Contracts for the Performance-Based Management and Maintenance of Roads in Mozambique

2007 - WB - Design and Procurement of Long Term Pilot Contracts for the Performance-Based Management and Maintenance of Roads in Mozambique

2007 - WB - Design and Procurement of Long Term Pilot Contracts for the Performance-Based Management and Maintenance of Roads in Mozambique

Description

This report presents a summary of the Consultant’s, findings and recommendations following a technical fact finding and project preparation mission in Mozambique to prepare OPRC pilot projects. The focus for the mission was road selection and collection of technical data for preparation of OPRC bidding documents. In addition, the Consultant met widely with stakeholders to discuss performance-based maintenance, of which there is some experience in Mozambique, and identify the most appropriate strategy for project implementation in the local context.This report presents a summary of the Consultant’s, findings and recommendations following a technical fact finding and project preparation mission in Mozambique to prepare OPRC pilot projects. The focus for the mission was road selection and collection of technical data for preparation of OPRC bidding documents. In addition, the Consultant met widely with stakeholders to discuss performance-based maintenance, of which there is some experience in Mozambique, and identify the most appropriate strategy for project implementation in the local context.

Published on
25 June 2019
Last Updated Date
21-03-2018
File Size
4.97 MB
File Type
application/pdf
Hits
1437 Hits
Download
3203 times
×