• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png
  • 16.png
  • 17.png
  • 18.png

2018 - Macedonia - Calibration of the rutting model in HDM 4 on the highway network

2018 - Macedonia - Calibration of the rutting model in HDM 4 on the highway network

2018 - Macedonia - Calibration of the rutting model in HDM 4 on the highway network

Description

The World Bank HDM 4 model is adopted in many countries worldwide. It is consisted of the developed models for almost all types of deformation on the pavement structures, but it can’t be used as it is developed everywhere in the world without proper adjustments to local conditions such as traffic load, climate, construction specificities, maintenance level etc. This paper presents the results of the researches carried out in Macedonia for determining calibration coefficient of the rutting model in HDM 4.

Published on
25 June 2019
Last Updated Date
28-03-2018
File Size
721.28 KB
File Type
application/pdf
Hits
2160 Hits
Download
742 times
×