• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png
  • 16.png
  • 17.png
  • 18.png

2001 - New Zealand Vehicle Operating Costs Model - Preparing VOC Tables

2001 - New Zealand Vehicle Operating Costs Model - Preparing VOC Tables

2001 - New Zealand Vehicle Operating Costs Model - Preparing VOC Tables

Description

The NZVOC Model is used by Transfund New Zealand to prepare tables of vehicle operating costs for their Project Evaluation Manual. Two projects were conducted to update the costs and develop a new version of the NZVOC Model, one in 1999 and a second in 2001-2003. The NZVOC model contains enhanced VOC relationships and formed the basis for the HDM-4 RUE model.

The NZVOC Model is used by Transfund New Zealand to prepare tables of vehicle operating costs for their Project Evaluation Manual. Two projects were conducted to update the costs and develop a new version of the NZVOC Model, one in 1999 and a second in 2001-2003. The NZVOC model contains enhanced VOC relationships and formed the basis for the HDM-4 RUE model.

Published on
25 June 2019
Last Updated Date
21-03-2018
File Size
2.21 MB
File Type
application/pdf
Hits
3613 Hits
Download
2107 times
×