• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png
  • 16.png
  • 17.png
  • 18.png

2005 - WB- Site Survey and Analysis of Highway Trucks Overloading Status Quo in Anhui

2005 - WB- Site Survey and Analysis of Highway Trucks Overloading Status Quo in Anhui

2005 - WB- Site Survey and Analysis of Highway Trucks Overloading Status Quo in Anhui

Description

Paper on World Bank study “Overloading Study for the Proposed Anhui Highway Project II”. This project aims at recommending strategies for the improvement of overloading enforcement by evaluating the current state of overloading in Anhui. It also tries to identify ways in which vehicle inspection systems can be deployed to enhance the highway services for both the user and government.Paper on World Bank study “Overloading Study for the Proposed Anhui Highway Project II”. This project aims at recommending strategies for the improvement of overloading enforcement by evaluating the current state of overloading in Anhui. It also tries to identify ways in which vehicle inspection systems can be deployed to enhance the highway services for both the user and government.

Published on
25 June 2019
Last Updated Date
21-03-2018
File Size
833.53 KB
File Type
application/pdf
Hits
1257 Hits
Download
1420 times
×