• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png

2001 - New Zealand Vehicle Operating Costs Model - Preparing VOC Tables

1717 Downloads

2001 - New Zealand Vehicle Operating Costs Model - Preparing VOC Tables

The NZVOC Model is used by Transfund New Zealand to prepare tables of vehicle operating costs for their Project Evaluation Manual. Two projects were conducted to update the costs and develop a new version of the NZVOC Model, one in 1999 and a second in 2001-2003. The NZVOC model contains enhanced VOC relationships and formed the basis for the HDM-4 RUE model.

File Name: 2003_nzvoc_man.pdf
File Size: 2.21 MB
File Type: application/pdf
Hits: 1897 Hits
Download: 1717 times
Created Date: 25-06-2019
Last Updated Date: 21-03-2018