• 1.png
  • 2.png
  • 3.jpg
  • 4.jpg
  • 5.png
  • 6a.png
  • 7.png
  • 8.png
  • 9.png
  • 10.png
  • 11.png
  • 12.JPG
  • 13.png
  • 14.png
  • 15.png

Welcome to Chris Bennett's and Lis Pedersen's web site. If you are looking for information Chris' current work on affordable housing, please visit www.mygbhousing.info. The video below tells the background to Chris' project.

 

2023 - India - Optimal pavement maintenance and management strategies for flood affected low volume rural roads

389 Downloads

2023 - India - Optimal pavement maintenance and management strategies for flood affected low volume rural roads

Due to the increase in urbanization and industrial development in India, there has been substantial traffic on the existing roads. This impact had increased public demand for good quality roads with better maintenance and high serviceability. Further, catastrophic events like flooding can cause damage to pavements, especially in those with granular base layers and thin asphalt mix surface layers. The degree of damage relies upon the vulnerability of the pavement to the entrance of surface water, the measure of water immersion, and the drainage quality of the pavement. The extensive literature review found limited studies on the post-flood maintenance strategy for low-volume roads by considering flood resilience. In the present scenario of changing climatic conditions, it is necessary to conduct a study on the post-flood maintenance strategy of low-volume rural roads in India. This study focuses on an approach to developing post-flood maintenance and rehabilitation strategies for flood-affected low-volume roads. Ten road stretches adversely affected by the flood were selected to fulfil the aim of the study. The post-flood maintenance strategy was determined based on the Pavement Condition Index (PCI) and deflection-based pavement performance with flood resiliency of pavement materials and budget constraints. The extensive data analysis revealed that the pavement with a cement-treated base or subbase has a longer service life and less Net Present Value (NPV) than all other alternatives. NPV is 30 to 45 for rehabilitation and 52 to 55 for reconstruction, lower than other alternatives considered in the study.

File Type: application/octet-stream
Hits: 558 Hits
Download: 389 times
Created Date: 12-06-2023
Last Updated Date: 03-05-2024

Adventures

Chris in the NCT Race 

Chris has an adventurous spirit which generally involves cycling, running, or just being out there having a good time. Read his 'Race Reports' below. This is a link to his SPOT GPS tracker. If you are interested in his 'geeky' sport technical blog it is at www.tri-duffer.com. He also has stories of his life as 'An Overtravelled Engineer Working for the World Bank' at World Bank Traveller.

 

Race Reports

Technical

Document Library

 

  • Chris' published papers and reports are here.
  • His Technical Library  has a range of reports 
  • Golden Bay community projects are here.
  • The history of the ROMDAS company is here.
  • The 'Road to Good Health' HIV/AIDs Toolkit is here.

 

Technical Library

Chris and Lis

Chris and Lis

We are Lis Pedersen and Chris Bennett. We’ve been married over 30 years and each found our way to New Zealand in the early 1980s from Denmark and Canada respectively. Golden Bay has been our happy place for almost 20 years and we are now based in Pohara just above the beach, with our two cats Coco and Max. 

 

 

 

Read More